The following road closures that may affect local residents are either ongoing or scheduled:
Start Date | Road Details |
---|---|
Friday, 25th Nov 2016 |
The A417 road bridge over the railway line at Challow will be closed for resurfacing, in two stages, from 22:00hrs on Friday, 25th through to 06:00hrs on Monday, 28th November (second stage). |
Friday, 18th Nov 2016 |
The A417 road bridge over the railway line at Challow will be closed for resurfacing, in two stages, from 22:00hrs on Friday, 18th through to 06:00hrs on Monday, 21st November (first stage). |
Friday, 11th Nov 2016 |
The A338 will be closed at Grove Bridge by the Volunteer pub from 20:00hrs on Friday, 11th through to 06:00hrs on Monday, 14th November for further electrification work. Further information regarding the works may be obtained by contacting Richard Foster of Bam Nuttall Ltd., on 07900 452984. |
Monday, 24th Oct 2016 |
On the A338 the old Grove Railway Bridge is to be demolished. Temporary traffic lights may cause the occasional delay while the pre-demolition work takes place. The work is scheduled to take approximately 2 weeks. At the same time on the Steventon Road in East Hanney there may be delays for gas works. |
Monday, 18th Jul 2016 |
Winter Lane northward to Southmoor will be closed for approximately 8 weeks owing to carriageway maintenance. The following documents have been provided for reference: |
Friday, 8th Jul 2016 |
The road towards Denchworth from West Hanney will be closed for approximately 4 weeks. |
Please contact Ian Gearing (OCC Highways & Transport) on 08453 101111, if any further information is required.